|
|
|
|
I started construction on my layout room in the fall of 2005. I set aside a 13'x40' room in the basement. I finished construction on the layout room in the spring of 2006. Bench work construction started soon after that. I decided to get the worst part of the bench work construction out of the way up front. I built the helix between the upper and lower levels in the summer of 2006. I’m now working on the lower level. The first area modeled on the lower level is Placerville.
![]() Layout Room Construction Benchwork/Track Construction - Helix (Dallas Divide) Benchwork/Track Construction - Placerville Benchwork/Track Construction - Vance Junction Benchwork/Track Construction - Ophir and Keystone areas Installing a Kadee #309 Un-coupler |
|
The Narrow Gauge Circle is written, maintained,and hosted by: Mark L. Evans Send Comments to:Mark L. Evans All original materials, text, and digital images Copyright © 1996-2006 Mark L. Evans. All rights reserved. Imitation is said to be the "sincerest" form of flattery.....Please don't flatter us without permission. |
|